I am attempting to build the Rampart from the design rules.
9 dtons... AF Cylinder... Armor Rating 62. I assumed TL 14 Bonded SD armor.
2.2 cm * Toughess 28 = 61.6. (Round up to 62)
Material Volume is 1.8 for the 9 dtons. Multiply by 1.3 for the AF to get 2.34. With 2.2 cm of armor, we lose 2.2 * 2.34 = 5.148 m3 of volume from our total available of 126.
Price is .028 * 2.2 = 3.8808 and Mass is 15 * 2.34 * 2.2 = 77.22.
SA us 2.34 * 100 = 234 available?
Wah. My head's spinning.
9 dtons... AF Cylinder... Armor Rating 62. I assumed TL 14 Bonded SD armor.
2.2 cm * Toughess 28 = 61.6. (Round up to 62)
Material Volume is 1.8 for the 9 dtons. Multiply by 1.3 for the AF to get 2.34. With 2.2 cm of armor, we lose 2.2 * 2.34 = 5.148 m3 of volume from our total available of 126.
Price is .028 * 2.2 = 3.8808 and Mass is 15 * 2.34 * 2.2 = 77.22.
SA us 2.34 * 100 = 234 available?
Wah. My head's spinning.