snrdg082102
SOC-14 1K
Hello again all,
I vaguely recall that an optional construction rule was introduced that allowed small craft to carry less than 1 ton of fuel instead of the 1 ton of fuel in CT LBB 5 HG 2.
I also think the rule allowed the power plant and maneuver drive to be less than 1 ton as required by CT LBB 5 HG2.
Can anyone please confirm my vague recollection and provide the source and page numbers if I'm not out to lunch?
I vaguely recall that an optional construction rule was introduced that allowed small craft to carry less than 1 ton of fuel instead of the 1 ton of fuel in CT LBB 5 HG 2.
I also think the rule allowed the power plant and maneuver drive to be less than 1 ton as required by CT LBB 5 HG2.
Can anyone please confirm my vague recollection and provide the source and page numbers if I'm not out to lunch?